Big Creek: Powerhouse No. 8 (part 1)
You might also be interested in
Image not available
Big Creek: Powerhouse No. 8 (part 2)
Visual Materials
Powerhouse No. 8, Part Two. Photographs of Powerhouse 8 diversion, excavation for powerhouse, diversion tunnel construction, interior shots of Powerhouse No. 8 (transformers, control room, turbine-generator assembly, station power, Johnson Valve, turbine runner, crane assembly, scroll case assembly, draft tube); Penstock rupture - ripped Penstock, flattened pipe, damage to powerhouse and other facilities, reshaping pipe, adding reinforcing bands to high stress sections of penstock; Camp 33, operator dormitory, substation, incline construction.
photCL SCE
Image not available
Big Creek: Powerhouse No. 2 and 2a (part 2)
Visual Materials
Photographs of Powerhouse 2 and 2A, Part Two. Views of auto transformers, substation, new 6600 V line, new bridge for powerhouse extension, Unit No. 4 with direct connected exciter, constructing new Unit No. 4, 150kV - 220kV Bushings, switchboard, installation of new Unit No. 4 penstock, concrete plant, incline batch cars, stand pipes, Unit No. 3 foundation, Unit No. 3 penstock install, valve house modification, rock crushing plant, Johnson Valve, assembly of new Unit No. 3, auto circuit breakers, 150kV Oil Switch, new hoist, autotransformers, and 11kV equipment, new Bus Bar installation, Governor No. 4; Camp No. 7 - telephone exchange, cottage, machine shop, warehouse, mess hall construction, sawmill; Camp No. 5 - forebay construction, batch plant, steam shovel excavating.
photCL SCE
Image not available
Big Creek: Powerhouse No. 1 (part 1)
Visual Materials
Photographs of Powerhouse No. 1, Part One. Views include generator floor, exterior with extension, close-up of Powerhouse 1, generator repairs, Unit 3 penstock construction, riveting penstock, transformer rack, substation, exterior before extension, extension construction, hoist house interior, assembly of Units 3 and 4, change to 220 kV transformers.
photCL SCE
Image not available
Big Creek: Powerhouse No. 3 (part 1)
Visual Materials
Photographs of Powerhouse No. 3, Part 1. Construction photographs of first forms up on powerhouse, staging and concrete plant, Switching Station, powerhouse steel framework, generator floor, draft tube construction, incline, views from above, penstock construction, Tunnel 3, CO2 equipment on Unit 3, Penstock binding, dispatcher's building, manifold assembly, oil circuit breakers, transformers, Dam 6 spilling, completed Powerhouse 3.
photCL SCE
Image not available
Big Creek: Hydro-electric project photo postcard album
Visual Materials
Album of photographic postcards of Big Creek and its infrastructure, as well as other hydroelectric projects, including Powerhouse 1 and 2, exciter, gate control, generator floor, Cascada cottages, Dam No. 4, San Joaquin and Eastern Railroad train nearing Cascada, train coming into Cascada station, Bear Creek, Pitman Creek, Magunden Substation; Kaweah No. 3 Switchboard; Toronto Power Co. - Niagara Powerhouse generator floor, Transformer Station, No. 8 Governor, Switchboards, switchrack, magnetic relays, forebay; Front Street Power Station.
photCL SCE
Image not available
Big Creek: Powerhouse No. 3 (part 2)
Visual Materials
Photographs of Powerhouse No. 3, Part 2. Views of generator floor with Units 1, 2, and 3 installed, excavation of Powerhouse 3 site with steam shovel and high pressure water gun, Switchyard construction, turbine parts, battery room, construction of penstocks, turbine assembly. Also penstock construction for Unit 3, Powerhouse No. 1 .
photCL SCE